The Combo System

Eight sequential layers, each doing a job none of the others can: the foam insulates against heat and sound, the rubberised coat stops water, the geotextile separates and protects, the screed gives fall and strength, primer and top coat resist the sun, the joint absorbs movement and the fillet closes the roof’s weakest point.

HOW THE BUILD-UP WORKS

How the build-up works

The system starts from the concrete deck itself: it is blown clean and upstands are masked to 50 cm against overspray. Polyurethane foam is then sprayed 3–4 cm thick at no less than 40–45 kg/m³; it bonds chemically to the concrete and runs up the walls to close the edge where most leaks begin.

Over the foam come the liquid rubberised coat and the geotextile, then the unreinforced screed, power-floated to calculated falls. The screed is cut into bays, the joints filled with elastic polyurethane, the surface primed, and the system closed with a reflective top coat.

THE EIGHT LAYERS

The eight layers

Hover or tap a layer to see what it does. The order is fixed: each layer depends on the one beneath being cured and bonded.

LAYERS 1 — 8

The eight layers

From the structural slab upward.

1

Sprayed polyurethane foam

3–4 cm · 45–48 kg/m³

The core of the system, sprayed in passes of no more than 2.5 cm to full thickness. Closed cells insulate against heat, water and sound at once.

↳ GRANDFOAM SS 45 + MDI
2

Liquid rubberised coating

2 coats · 2–4 m²/L

A rubber-modified bitumen film applied straight onto the foam: the first waterproof line, sealing any surface pores.

↳ GRANDCOAT EM 5
3

Geotextile separation layer

120 g/m² · PP non-woven

Separates and protects the coating from the screed, preventing abrasion and puncture and spreading stress.

↳ GRANDGEO 120 / GEOTEC 120GSM
4

Unreinforced screed

to falls · power-floated

Poured and power-floated so water runs to the drains, divided by fibre-board expansion joints.

↳ Screed + GRANDBOARD JF
5

Exterior primer

UV resistant

A UV- and weather-resistant base coat that seals the screed and improves top-coat adhesion.

↳ PU PRIMER (EXTERIOR)
6

Movement joint

PE backing + PU sealant

Cut open seven days after pouring, then filled with closed-cell backer rod and elastic polyurethane to absorb movement.

↳ GRANDSUPER PU + Polyrod
7

Top coat

reflective · PU / epoxy

The final epoxy or polyurethane coat: reflective, UV- and weather-resistant, protecting everything beneath.

↳ LASTOFLEX-PU / HYPERDESMO
8

Perimeter fillet

45° · ≥ 5 cm

A 45° sand-cement fillet along parapets, upstands and light wells, finished with mesh tape.

↳ Fillet + mesh tape
The order is not optional: each layer depends on the one below being cured and bonded. Any shortcut in sequence or curing time voids the system guarantee.
COMBO VS. TILED

Combo vs. traditional tiled roofing

Point-by-point against the Shtayker screed-and-tile practice.

ItemComboTiled (Shtayker)
Thermal insulationFull thermal break from the interiorWeak — polystyrene laid loosely
Electricity useUp to 40% lowerNo noticeable effect
WaterproofingMultiple successive linesOne weak, short-lived line
Locating a leakFast and localHard — may need full strip-out
Movement jointElastic PU, heat-resistantFails under thermal movement
Load on structureLighterHeavier
Acoustic insulationBuilt into the systemNone
Scheduled maintenanceNot neededRegular and repeated
UV resistanceResistant, reflective top coatNot provided
Rainwater run-offSmooth surface to calculated fallsSlower
Environmental impactCFC-free, green-certified materialsNot assessed
Service lifeLong — 25+ years of serviceRelatively short
Finished top coat
Finished top coat
Handed-over compound roof
Handed-over compound roof
WHY COMBO

Twelve advantages

01

Excellent thermal break

Insulates the whole slab, while tiled roofing stays weak because its polystyrene is laid loosely.

02

Saves up to 40% on electricity

Heat gain through the roof drops sharply, so air-conditioning runs less and the power bill falls.

03

Longer life for AC units

Shorter running hours extend HVAC service life and cut maintenance cost.

04

Multiple lines of waterproofing

Combo relies on several redundant waterproof lines; tiled roofing has one weak, short-lived line.

05

Leaks are easy to locate

A failure can be found and fixed locally, where tiled roofs may need a full strip-out.

06

Lighter on the structure

Lower dead load than tiled screed roofs.

07

Environment-friendly

CFC-free, with materials certified under green-building schemes.

08

UV-resistant top coat

The reflective top coat resists UV and weather.

09

Fast rainwater run-off

A smooth, correctly sloped surface drains quickly.

10

Robust movement joints

Joints that hold up under thermal cycling, unlike tiled-roof joints.

11

Long life, no scheduled maintenance

No periodic maintenance, unlike tiled roofing.

12

Mid-range price

Certified international materials at a mid-range price.

In short: one application gives the roof everything it needs — thermal, waterproof and acoustic insulation — replacing traditional screed layers with a build-up bonded chemically and mechanically to the concrete, removing the weak seams where most leaks start.