Al-Rafidain Pearl Al-Rafidain PearlAl-Rafidain Pearl
ع
  1. Home
  2. About us

About us

An Iraqi specialist in combined roof insulation — thermal, waterproof and acoustic in a single build-up — based on high-pressure sprayed polyurethane and a full stack of protective layers, working across Baghdad and Iraq’s governorates for developers, contractors and consultants.

Who we are

Al-Rafidain Pearl for Industrial & Real-Estate Investment and General Contracting was founded in Iraq. We are one of its branches, specialised in thermal and waterproof insulation with the latest materials, and we have built every capability we have around the Combo system — eight sequential layers applied with precision to concrete roofs.

The system has been in use in the United Arab Emirates for more than twenty-five years. Our company introduced it to Iraq and has applied it on several large residential developments over recent years. Developers now prefer it to traditional tiled (Shtayker) roofing for technical and economic reasons.

We are based on Abu Nuwas Street in Baghdad and operate a mobile field fleet that carries spray rigs, tanks and materials straight to site, which lets us deliver whole compounds of thousands of units on controlled schedules.

Completed Combo roof with reflective top coat
SINCE
System track record of 25+ years in the Gulf market
SCOPE
Combined insulation · waterproofing · roof remediation
BASE
Baghdad — Abu Nuwas St., near Palestine Hotel
REACH
Baghdad · Najaf · the governorates
VISION

Vision

For the Combo system to become the default for every building, villa and commercial roof, so that people benefit from what it offers — and for Al-Rafidain Pearl to be the technical reference the field turns to.

MISSION

Mission

To hand over a roof that doesn’t leak, doesn’t radiate heat and needs no scheduled maintenance — with original materials, trained hands and full documentation of every layer, at a mid-range price rather than a premium one.

OPERATING VALUES

Operating values

Specification first

No spray starts before the deck passes engineering acceptance.

Transparency with the client

Signed flood-test report; every layer photographed before it is covered.

Original materials only

Certified international materials, lab-verified — no substitutions.

Crew safety

Mandatory respiratory protection and full PPE at every spray stage.

CAPABILITY

Plant, equipment and crews

A mobile spray fleet, trained engineering and application crews, and written QA/HSE controls applied from survey to signed flood test.

  • High- and low-pressure proportioners

    1:1 by volume, hose heat held at 50–55 °C for complete mixing in the gun chamber.

  • 2:1 transfer pumps

    Move material from drum to proportioner with no contamination or moisture.

  • Equipped field truck

    Self-contained mobile spray unit: rig, generator, drums and PPE.

  • Compressed-air blowers

    Clean the deck and upstands of dust before spraying.

  • Power float (“helicopter”)

    Finishes the screed so water runs to the drains.

  • Cutting and finishing tools

    Grinders, hammer drills, rollers, brushes and cartridge guns.

ISO and POLY drums for polyurethane foam
CREW STRUCTURE

Crew structure

  • Engineering survey and requirement setting
  • Certified sprayer and machine operator
  • Deck preparation and fillet crew
  • Screed, power-float and joint crew
  • QC inspector documenting every layer
QA / HSE

Quality assurance & site safety

Engineering survey before acceptance

No work starts before services, drains and falls are fixed and conflicting works are cleared.

Pass-thickness control

No single pass exceeds 2.5 cm; the 3–4 cm total is built up in passes.

Weather control

No spraying within 3 °C of the dew point or in winds above 20 km/h.

24-hour flood test

The roof is flooded for 24 hours; a pass is recorded in a report signed with the client.

Photo record

Every layer is photographed before it is covered and filed with the handover pack.

Personal protection

Respiratory protection is mandatory at every spray stage. Full coveralls, chemical goggles and rubber gloves are worn, and containers are opened carefully to release pressure slowly. Clothing is washed before reuse; eye contact is flushed immediately with plenty of water for fifteen minutes and a doctor is consulted.

STANDARDS

Reference standards for materials

Applies toStandard
Expansion-joint filler boardsASTM D1751 / D545 / D994
Rubberised bituminous coatingsASTM D1227 Type II · BS 8102
Movement-joint sealantsASTM C920 Type S Grade NS Class 25
Elastic sealant specificationsBS 4254 · BS 5215 · BS EN ISO 11600
Non-woven geotextileASTM D5261 / D4595 / D4491 / D4751
Water permeability of cementitious membranesBS 1881 Part 5 · DIN 1048 Part 5
Fire classification of foamDIN 4102-1 (B3)
Thermal conductivityASTM C518
Liquid membranes & concrete protectionETAG 005 · EN 1504-2
Low-emitting materialsAl Sa'fat — Dubai Green Building System
Request a site survey

Your next roof starts with an engineering survey

Our engineers visit the site, fix drain, service and load positions, and set the requirements before any spraying starts.