Al-Rafidain Pearl Al-Rafidain PearlAl-Rafidain Pearl
ع
Industrial & Real-Estate Investment · General Contracting

Protect your homewith the Combo System

Combined thermal, waterproof and acoustic insulation for roofs: high-pressure sprayed polyurethane foam under seven protective layers, applied in sequence and handed over with a signed flood-test report.

Technician spraying polyurethane foam on a concrete roof as part of the Combo system
GRANDFOAM SS 4545–48 kg/m³ · 3–4 cm
25+

years of system service in the Gulf

40%

cut in cooling electricity

8

layers in every build-up

5,800+

villas delivered in Baghdad & Najaf

Al-Rafidain Pearl field truck loaded with material drums and spray equipment Mobile field spray unit
Who we are

An Iraqi company built around one promise: a roof that doesn’t leak

We are a branch of Al-Rafidain Pearl, specialised in thermal and waterproof insulation with current-generation materials. The system has been in service in the UAE for more than twenty-five years; we brought it to Iraq and have applied it on major residential developments. Developers now choose it over traditional tiled (Shtayker) roofing for technical and economic reasons.

SINCE
System track record of 25+ years in the Gulf market
SCOPE
Combined insulation · waterproofing · roof remediation
BASE
Baghdad — Abu Nuwas St., near Palestine Hotel
REACH
Baghdad · Najaf · the governorates
Learn more
The build-up

Eight layers, each doing a job no other layer can

Hover or tap a layer to see what it does. The order is fixed: each layer depends on the one beneath being cured and bonded.

Advantages

Why Combo instead of tiled roofing?

01

Excellent thermal break

Insulates the whole slab, while tiled roofing stays weak because its polystyrene is laid loosely.

02

Saves up to 40% on electricity

Heat gain through the roof drops sharply, so air-conditioning runs less and the power bill falls.

03

Longer life for AC units

Shorter running hours extend HVAC service life and cut maintenance cost.

04

Multiple lines of waterproofing

Combo relies on several redundant waterproof lines; tiled roofing has one weak, short-lived line.

05

Leaks are easy to locate

A failure can be found and fixed locally, where tiled roofs may need a full strip-out.

06

Lighter on the structure

Lower dead load than tiled screed roofs.

07

Environment-friendly

CFC-free, with materials certified under green-building schemes.

08

UV-resistant top coat

The reflective top coat resists UV and weather.

09

Fast rainwater run-off

A smooth, correctly sloped surface drains quickly.

10

Robust movement joints

Joints that hold up under thermal cycling, unlike tiled-roof joints.

11

Long life, no scheduled maintenance

No periodic maintenance, unlike tiled roofing.

12

Mid-range price

Certified international materials at a mid-range price.

Certificates

Materials verified by independent laboratories

DCLD · Dubai MunicipalityProduct conformity — CL21020794
ACES DubaiThermal, ASTM C518: 0.0213–0.0233 W/m·K
METSCompressive 294–299 kPa
Wimpey LaboratoriesCompression & tension, ASTM D1621 / D412
Material LabJoint board 804 kPa @ 50%
Learn more
Request a site survey

Your next roof starts with an engineering survey

Our engineers visit the site, fix drain, service and load positions, and set the requirements before any spraying starts.